REHABILITATION WORKS

Carlos Carranza Berm Repair and Restoration – APRIL 2010

Contract work on this project was in relation to the Tradewinds exercise. The works were prepatory and restoration works and included removal of existing material, re-shaping of berm and slope embankment to 1:1 in maximum layers of 20cm. Compaction was done in compliance of ASTM D 1557 for cohesive materials (90% compaction).

In addition, the firing positions at this K-D range were restored to original condition including the cmu walls. Finally, we provided for grassing of the reconstructed berm using local grass as a form of erosion control

 REHABILITATION  REHABILITATION  
 Figure 3- Before  Figure 4- During  Figure 5- After

Albert & Regent Street Rehabilitation Works - 2009

Our involvement in the rehabilitation project of downtown Belize City included the demolition of all existing sidewalks on Albert Street and construction of drains and new sidewalks with an architectural finish. Stamped Concrete was chosen for its aesthetic value and the Maheias United decorative concrete team delivered on the concept. On Regent Street, drains were repaired and sidewalks were installed on both sides of the street. The result: a friendlier and safer walking environment for Belizeans and visitors alike.

print





   About Maheias
   Our History
   Project Gallery
   Our Products
   Our Services

Email:
info@maheias.com

Phone:
O. 501-224-4436
F. 501-223-3889

Contact us today to request
a quotation on your next
project.


christian louboutin replica christian louboutin outlet cheap canada goose